The Project
The project included the modification of approximately 0.8km of the P3C/C2F 230kV double circuit overhead transmission line to achieve the vertical clearance required for the Regina Highway Bypass project. The work encompassed the installation of ten structures along with the supply and installation of four steel casings, cathodic protection, and salvage work. One of the circuits remained energized throughout the duration of work; therefore, energized work methods were employed.
Client: SaskPower
Owner: SaskPower
Category: Energized Services Transmission
Location: Regina, Saskatchewan