BC Hydro ROC

The Project

The ROC supports the delivery of BC Hydro’s Distribution Overhead and Underground work, including trouble response, maintenance, system improvement, and customer-driven work programs. Allteck is responsible for delivering work in the regions of Terrace, Smithers, Prince George, Williams Lake, and Victoria, British Columbia, which includes maintenance and system improvement work, transformer upgrades, installation, removal, and repair of overhead and underground distribution facilities, replacement of metering kits, street lights, and livefront kiosk, as well as customer work (extensions/improvements).

The Challenges

  • Provide value-added solutions using community-based planning
  • Scheduling resources and work to allow for efficient execution within milestones and budget
  • Provide support for customer-driven work and 24hr trouble response for emergencies and storms

 Specialized Work Methods

  • Distribution Live Line Work
  • Underground distribution
  • Feeder cable installation
  • Confined Space
  • Atlas Copco 22” rock drill
  • Use of Allteck’s Robotic Arm, rated for side load, which makes angle structure replacements safer and more efficient. The robotic arm can telescope and rotate energized phases, enabling a larger and safer pole setting window, increasing crew safety during construction. It is also remotely operated, increasing efficiency and versatility.

Client: BC Hydro

Owner: BC Hydro

Category: Distribution

Location: Terrace, Smithers, Prince George, Williams Lake, Victoria